0

Can I use Digi-Key part numbers in my BOM?

Yes, designers use the Digi-Key part numbers quite frequently. • Digi-Key Part # • Reference Designator • Description • Package Type (footprint)

0

What are the requirements for the Bill of materials formatting?

The BOM should include: • Supplier and Part # • Reference Designator • Description • Package Type (footprint) The Microsoft Excel format (.xls, .xlsx, .csv, or tab-delimited) is required for the [...]

0

What is Centroid data?

Centroid data is also known as Insertion or Pick-and-place or XY data. This is the machine placement file and should include: • X, Y, Theta • Side of Board (Top or Bottom) • Reference Designator [...]

0

What standards and certifications does RushPcb Inc follow?

• RUSH PCB Inc is certified ISO 2001:9000, ITAR, UL & Cage Code • By default, we inspect to IPC-A-610, Class II (Class III inspection available upon request) • For RoHS, we adhere to [...]

0

What about panelized boards (sometimes called an array)?

If you want us to assemble a full panel of boards, you should still quote the individual board. Unless instructed otherwise, we will de-panelize the boards after assembly. In the “Special [...]

0

What about moisture sensitive components?

Over time, many SMT component packages absorb small amounts of moisture. When these components go through the reflow oven, this moisture may expand, damaging or destroying the component. [...]

0

Can you handle lead-free builds?

Yes, we can handle Lead-Free PCB Assembly.

0

How do you process payment for a turn-key job?

An up-front payment is required. This must be the cost of components or 50% of the order, whichever is greater. The balance is due at the time of shipment unless your company is approved for Net terms.

0

What do I need to send for a turn-key order?

• Bill of material, complete with information in excel format. ⁨ Complete info includes – manufacturer’s name, part number, ref designators, component description, quantity • Complete Gerber [...]

0

What happens to the leftover components on Turn-Key orders?

Extra components, purchased to meet the supplier’s minimum order, are turned over to the customer after assembly along with the finished PCBs. Any extra components needed for normal assembly are [...]

page 1 of 4