The BOM should include: • Supplier and Part # • Reference Designator • Description • Package Type (footprint) The Microsoft Excel format (.xls, .xlsx, .csv, or tab-delimited) is required for the [...]
Centroid data is also known as Insertion or Pick-and-place or XY data. This is the machine placement file and should include: • X, Y, Theta • Side of Board (Top or Bottom) • Reference Designator [...]
• RUSH PCB Inc is certified ISO 2001:9000, ITAR, UL & Cage Code • By default, we inspect to IPC-A-610, Class II (Class III inspection available upon request) • For RoHS, we adhere to [...]
If you want us to assemble a full panel of boards, you should still quote the individual board. Unless instructed otherwise, we will de-panelize the boards after assembly. In the “Special [...]
Over time, many SMT component packages absorb small amounts of moisture. When these components go through the reflow oven, this moisture may expand, damaging or destroying the component. [...]
An up-front payment is required. This must be the cost of components or 50% of the order, whichever is greater. The balance is due at the time of shipment unless your company is approved for Net terms.
• Bill of material, complete with information in excel format. Complete info includes – manufacturer’s name, part number, ref designators, component description, quantity • Complete Gerber [...]
Extra components, purchased to meet the supplier’s minimum order, are turned over to the customer after assembly along with the finished PCBs. Any extra components needed for normal assembly are [...]